Building 1 Project Room #2 Renovation
Bracks Construction was hired to establish and maintain the QC program for the project. The QC program consisted of a QC Manager, a QC plan, a Coordination and Mutual Understanding Meeting, QC meetings, three phases of control, submittal review and approval, testing, and QC certifications and documentation necessary to provide materials, equipment, workmanship, fabrication, construction […]
Building 15 East Office Repairs – Phase 1
Bracks Construction led the Conceptual Design team along with aid of an A&E Contractor, and continued after the award as the lead Project Manager along with the USACE COR to assist the Design Build Contractor to execute the construction phase. The Contractor provided the necessary labor, material, equipment, and supervision to provide design and construction […]
McNeal Avian Center, Bird House (Historical)
Bracks Construction performed Selective building demolition to remove the rear of the building for an extension. We were responsible for removing concrete foundation grade beams, and graded site to subgrade for new construction.
P-188/189 RDT&E SUPPORT FACILITY, NSWC
Bracks Construction was hired as part of the Integrated Product Team that led the source selection for this Design/Bid/Build project along with the NAVFAC counterparts. Bracks Construction continued the project after the award as the Co-Project Manager along with Dave Heller and the NAVFAC Construction Manager (Jose Morales) to assist the winning Contractor to execute […]
Diamond Green Apartments
Original contract was to rough-grade the site to the proposed elevations to drive 97 wood piles. Excavate for and install concrete footers, foundations and slabs. Install sanitary sewer, storm sewer, domestic water, city sidewalks and curbs. However the pre-construction procedures missed a pre-existing factory that was demolished and covered up. Therefore, in addition to our […]
P110 Replace Condemned Coatings Lab
Bracks Construction has led the Conceptual Design team along with his NAVFAC counterparts… he continued after the award as the lead Project Manager along with the NAVFAC Construction Manager (Jose Morales) to assist the Design Build Contractor to execute the construction phase. The proposed project was to construct a 6,000 SF pre-engineering structure to replace […]