Edison Square (Edison High School Demolition)

Bracks Construction was hired to perform the demolition of Edison High School. The project included the removal of debris from site; crushed the stone from the building to a 2A modified, 3” and 4” ballast specification. We utilized the recycled 2A product for controlled backfills of basements to 100% compaction. Graded site to subgrade for […]
McNeal Avian Center, Bird House (Historical)

Bracks Construction performed Selective building demolition to remove the rear of the building for an extension. We were responsible for removing concrete foundation grade beams, and graded site to subgrade for new construction.
Building 15 Roof Replacement

Bracks Construction was hired as the Project Manager that prepared all pre-contract award documentation, as well as, overseeing the execution. This project included the removal of over 30,000 square feet of existing roofing, repair any damaged decking, install new capping and replace with TPO Roof system, and the replacement of all roof downspouts. Contractor was […]
USPS Processing and Distribution Center

Bracks Construction has experience in installing a sewage treatment facility. This project required an installation of three (3) facility sanitary sewer lines at an average 21 foot depth. The lines were tied into 2 manholes across Lindbergh Blvd (State Highway & Septa Bus route), and tied into the city sewer main on the same line […]