USPS Processing and Distribution Center
Bracks Construction has experience in installing a sewage treatment facility. This project required an installation of three (3) facility sanitary sewer lines at an average 21 foot depth. The lines were tied into 2 manholes across Lindbergh Blvd (State Highway & Septa Bus route), and tied into the city sewer main on the same line […]