301.509.3886
Give us a Call
General Inquires
Email Us
11510 College View Drive
Silver Spring, MD 20902
Give us a Call
Email Us
Silver Spring, MD 20902
Bracks Construction has experience in installing a sewage treatment facility. This project required an installation of three (3) facility sanitary sewer lines at an average 21 foot depth. The lines were tied into 2 manholes across Lindbergh Blvd (State Highway & Septa Bus route), and tied into the city sewer main on the same line in one location across Lindbergh Blvd. Provided necessary traffic control, street restoration and paving to city specifications.